Case Study-2
- Client: Indian Oil Corporation; Paradip, Odisha
- Product Used: In-Situ composite repair solutions
- Material Used: Nanofillers reinforced polymer composites wrap
Through hole defect on the riser pipeline of tank cooling water sprinkler pipeline system
Pipe diameter: 152.4 mm
Hole dimensions: 40 mm x 100 mm (40 mm in the circumferential direction and 100 mm in the axial direction)
Perform a preventive maintenance before putting a metallic sleeve.
Through hole defect on the riser pipeline of tank cooling water sprinkler pipeline system
Pipe diameter: 152.4 mm
Hole dimensions: 40 mm x 100 mm (40 mm in the circumferential direction and 100 mm in the axial direction)
Covering of defect area with Fiber glass reinforced preform followed by fiber glass reinforced plastic overwrap using hand layup technique.
Rehabilitation of the pipe
The difficulties in surface preparation in a real time situation
The way logistics have to be planned for a repair.
Subscribe now
We will not spam your email.